Pressure cascade

Walk an ISO 7 plant: gowning, corridor, then the graded rooms. Design, construction, and the tests sit on one drawing.

Airlock, gowning, and hand disinfection.

Numbers from the work

2,017 Founded
17 Published projects
20,000 Largest single area m²
5 Shortest design-to-validation (months)

Each project names its own result: PIC/S GMP, TFDA, and others only when that record has them.

Demo

The room, watched overnight

Temperature, humidity, and differential pressure on a clock that does not sleep. The figures here are a demo, not a live plant.

22.4°C · 48% RH · +15 Pa · Demo

ΔP alarm · Demo

Grade C −2 Pa / 00:14

EVMS section

PE ZD’s scope

Turnkey delivery, public-project controls, consulting, and qualification sit with the team that draws the rooms.

PE ZD Engineering Co., Ltd.

Turnkey design, construction, and C&Q. Public-project PCM. Consulting, project management, and validation for plants that have to hold a grade.

From the first interview to a qualified room

  1. 01Interview / URS
  2. 02Concept and quote
  3. 03Design
  4. 04Construction
  5. 05TAB / C&Q
  6. 06Handover and monitoring

Request an interview