GDP warehouse environmental monitoring

Design

Design

Turnkey starts on the drawing. URS to DQ gets the grade right, from design through validation, right the first time.

GDP warehouse environmental monitoring

URS / feasibility

Capacity, grade, regulation, and what the site will not allow, written so a price can be put on it.

Concept to detail

Plans, the HVAC strategy, and utilities, then drawings a DQ review can mark up.

People and materials

Gowning, raw materials, waste, and product never share a door. Pressure follows that split.

  • Sub-fab & Support AreasISO Class 5–7
  • Photolithography (incl. EUV)ISO Class 1–3
  • Failure Analysis / R&D LabsISO Class 6–7
  • Implanted Medical DeviceISO 5 6 7 8

One turnkey contract for design, build, and qualification. Right the first time.