Commissioning
Engineering acceptance of equipment and system function.
Validate
Commissioning, qualification, and validation, nested from engineering acceptance to full GxP. All inside PE ZD’s scope.
NHRI vaccine plant 2
Engineering acceptance of equipment and system function.
Engineering and QA acceptance for a GxP laboratory or manufacturing plant.
Hardware, software, and process parameters together, for full GxP readiness.
HVAC — Leak test, PAO, air balance, recovery.
測試 is Commissioning. 驗證 is Qualification. 確效 is Validation. The same Taiwan team runs them to international GxP standards.