2,000 m² cell-therapy pilot plant

Validate

Validation

Commissioning, qualification, and validation, nested from engineering acceptance to full GxP. All inside PE ZD’s scope.

2,000 m² cell-therapy pilot plant

Commissioning

Engineering acceptance of equipment and system function.

Qualification

Engineering and QA acceptance for a GxP laboratory or manufacturing plant.

Validation

Hardware, software, and process parameters together, for full GxP readiness.

HVAC — Leak test, PAO, air balance, recovery.

  • CleanroomAir changes, ΔP, particles, light, airflow
  • HVACLeak, PAO, balance, recovery
  • Process gasGas qualification
  • WaterPW / WFI qualification
  • SterilizerAutoclave qualification
  • Cold chainCold room, warehouse, mapping
  • ComputerizedPLC / CSV

測試 is Commissioning. 驗證 is Qualification. 確效 is Validation. The same Taiwan team runs them to international GxP standards.