URS / feasibility
Capacity, grade, regulation, and what the site will not allow, written so a price can be put on it.
Design
Turnkey starts on the drawing. URS to DQ gets the grade right, from design through validation, right the first time.
TBMC cleanroom turnkey
Capacity, grade, regulation, and what the site will not allow, written so a price can be put on it.
Plans, the HVAC strategy, and utilities, then drawings a DQ review can mark up.
Gowning, raw materials, waste, and product never share a door. Pressure follows that split.
One turnkey contract for design, build, and qualification. Right the first time.