One team
The people who draw the room run TAB, IQ, OQ, and PQ.
About
Since 2017, one Taiwan team has designed, built, and qualified rooms for biopharma, semiconductors, and hospitals in Taiwan and across Asia.
ISO 7 renovation without stopping production
The people who draw the room run TAB, IQ, OQ, and PQ.
Interview, design, construction, qualification, handover.
Turnkey, public-project PCM, or consulting when a builder is already hired.
Grade, flow, and pressure are settled before construction.
ISO rooms, including live renovation that keeps the line shipping.
Anywhere a dirty room will not do.
Turnkey starts on the drawing. URS to DQ gets the grade right, from design through validation, right the first time.
Cleanroom, HVAC, and utilities in one contract. A running plant can be rebuilt one zone at a time.
Commissioning, qualification, and validation, nested from engineering acceptance to full GxP. All inside PE ZD’s scope.
One set of sensors for the night shift and for the mapping study. The platform is ATloge. PE ZD installs it on the plant.
Turnkey work, consulting, and qualification follow one sequence, and PE ZD holds all three.
Each project names its own result: PIC/S GMP, TFDA, and others only when that record has them.
PE ZD Engineering Co., Ltd., founded in Taipei in 2017. 振東整合工程有限公司.
Team photos and certificates wait for consent. The registration number is published when it is confirmed.
Tell us the grade, the site, and the date the plant has to run. Design, construction, and validation get planned from there.